Coca Cola Factory

Coca Cola Factory

Location: Belfast
Duration: 10 weeks
Contractor: Cleary Contracting

Description

Warehouse Extension (including Air Handling Unit Plant Room) on a live site. Required a lot of co-ordination as fit out of factory equipment was being carried out at same time by specialist machine installers as well as the air handling unit being installed by mechanical contractors at the same time. This co-ordination was key as contract duration was 10 weeks.

Work Carried Out

  • New MCCB TPN Panel Board supplied from existing subswitchboard
  • Controller for New Air Handling Unit Connected
  • Control Panel for Cold Room Installed
  • General and Emergency High Bay Light Fittings Installed
  • External Lighting Installed
  • Small Power Accessories
  • Containment Installation
  • Lightning Protection Installed