Room2 Hotel
Room2 Hotel
Location: Belfast
Duration: 14 Months
Contractor: Ganson UK
Description
175 bed apartment hotel building.
Haughey Electricals appointment for the works was on a 'design and build' basis. The design intent was prepared by Arup and discharged to Technical Design stage.
Work Carried Out
- Photovoltaic (PV)
- Emergency back-up power generator system
- Lightning protection
- Fire suppression systems
- TV aerial installation
- Voice / Data and Telecommunications
- PA and music system
- Audio visual systems
- Security systems
- Hearing enhancement systems
- Submittal of load calculations prior to installation.
- Detailed design of automatic controls systems to meet with operational and spatial requirements of the specification
- Dimensioning of, and final installation details of, automatic control panels to suit the detailed requirement of the agreed supplier of the controls equipment